The Sallente-Estany Gento reversible hydroelectric power plant was commissioned in 1985, after almost five years of construction. This power plant operates with water from the Gento Lake, which reaches Sallente through two penstocks. It has two reservoirs: the upper one, which is a natural lake, and the Sallente one, built specifically to store the water once the electricity has been generated.
The Sallente power plant operates with two different processes: one of generation, in which the turbine is used to transform water into electrical energy, and one of storage, in which the water is pumped to the upper pond to recover potential energy.
This power plant has a capacity of 415 megawatts and is located inside a cavern specially excavated to house the facilities.
During construction, almost 900 people worked there, hired by the companies Dragados and Copisa.
The hydroelectric complex includes the Sallente dam, the Gento Lake, the engine room and the transformer station.
To facilitate the transport of materials and machinery to the upper lake, a cable car was built. This cable car is currently used during the summer months to take visitors to the southern entrance of the Aigüestortes and Estany de Sant Maurici National Park.